Page 95 - Designing Ways 257
P. 95

The original concrete floors were polished and stained to reflect
                                                             additional light, while their vibrant colours warm the space. The
                                                             school’s desire to have an open and transparent pedagogy resulted in
                                                             a full-height wall of glazing in each classroom.


                                                             The facade proudly showcases the school’s identity along the major
                                                             thoroughfare of Belvidere Road, as its tones reflect a gradient of
                                                             CRSM’s school colours. The southern site development aims to
                                                             deteriorate the existing sea of concrete, providing the community
                                                             with a glimpse of what lies hidden behind the existing building to
                                                             the north: a serene natural wetland. Rather than tucking the athletic
                                                             fields in the rear of the school, the new facility showcases them.
                                                             The 55,000 square foot build-out incorporates 18 classrooms, three
                                                             science laboratories, offices, and a cafeteria. It also features a library
                                                             commons area for students, with a new HVAC system controlled by
                                                             web-based building automation technology.      dw


                                                             Technical Sheet
                                                             •   Official Project Name: Cristo Rey St. Martin College Prep
                                                             •   Location: Waukegan, Illinois, USA
                                                             •   Client: Cristo Rey St. Martin
                                                             •   Architects/designers: JGMA
                                                             •   Project Design Principal: Juan Moreno
                                                             •   Project Manager: Dan Spore
                                                             •   Collaborators: Forefront Structural Engineers – Structural
                                                                Engineering
                                                             •   Gloger Engineers, LTD – Civil Engineering
                                                             •   MVP Services Group – Food Services
                                                             •   GHC Mechanical – Mechanical Engineering
                                                             •   Hera Lab Planners – Laboratory Design
                                                             •   Site Design Group, Ltd. – Landscape Architects
                                                             •   D.A.M. Plumbing Inc.  – Plumbing
                                                             •   US Alliance Fire Protection – Fire Protection
                                                             •   Project sector: Education
                                                             •   Budget: 9.6 M USD
                                                             •   Project completion date: 2021
                                                             •   Photographer: Dimitre Photography Inc. / McShane
                                                                Photography
                                                             www.jgma.com/jgma-projects/cristo-rey-st-martin-college-prep/




































                                                                                                  dw • Issue 257  95
   90   91   92   93   94   95   96   97   98   99   100