Page 59 - Designing Ways 278
P. 59
Lestage Lizotte Stecker, Option
aménagement et Williams Asselin
Ackaoui
• Partner: Ministère des Transports et
de la Mobilité durable
• Engineering: AtkinsRéalis, WSP,
Tetra Tech
• Process engineering: François
Ménard
• Construction manager: Pomerleau
• Contractors: Construction BML
– Station de la Côte, station de la
Voile et Boulevard, Construction
Deric – Station de la plage, mirror
of water and the swimming area,
Construction Citadelle – Pavillon
de la Côte et Pavillon de la Voile,
Bauvais & Verret – Pavillon des
Baigneurs
• Photo credits: Adrien Williams,
Stéphane Groleau, Maxime Brouillet,
Daoust Lestage Lizotte Stecker
/ Luca Fortin, Nicole Grenier,
Radio-Canada / Erik Chouinard,
Bibliothèque et Archives Canada,
Archives du Musée McCord,
Coastal Meadows; gardens composing a native Archives de la Ville de Québec dw
coastal landscape, animated by giant pebbles
www.daoustlestage.com
Beach sector; an attractive and recreational
centre within the entire project
dw • Issue 278 59