Page 59 - Designing Ways 262
P. 59
Aerial view-plants
Photo credit: Tus-Design Group Co.,Ltd
was introduced, thus abandoning the the application of ecologically-native
previous rigid method of a flood control materials and advanced design techniques
dike. The design combines the flood in order to achieve the desired landscape
control shoreline with the landscape.The effects in a cost-efficient manner.
terrain, sketches, plants, etc. are naturally Additionally, the project adhered to a "low
integrated with the flood control route, intervention" development programme in
so that the walkway can be hidden in the order to reduce impacts on the greater
whole environment, which improves the ecological environment of the site. dw
spatial experience of walking. Waterside
The carrying out of this important https://mp.weixin.qq.com/s/ Photo credit: Tus-Design Group Co.,Ltd
ecological project relied heavily on i3JHOaghKCM_7ugSBkN6VQ
Aerial view-walking path
Photo credit: Tus-Design Group Co.,Ltd
dw • Issue 262 59

