Page 56 - Designing Ways 281
P. 56

ON THE
               TERRACE



















































           limited  to  just  20  US  dollars  per  square
           metre, and it was expected to be finished
           in  a  very  short  timeline  of  18  months.
           The project was overseen by the army,
           with very little experience and skills in
           landscape projects.
             In  addition  to  the  high  risk  of  urban
           flooding, the canal at the north border is
           heavily contaminated. Except for a small
           tobacco factory museum and a sports
           centre, there are no required programmes
           for the site. The design was the result of an
           international competition.

           3. Design objectives and strategies
             In addressing the multiple  challenges
           of the site and the city, the project was
           intended to be designed as a central
           park that can provide holistic ecosystem
           services to the city, including stormwater
           regulation to adapt to the changing
           monsoon climate. It was also intended
           to demonstrate a nature-based solution
           to cleansing ubiquitously polluted urban
           water,  life  supporting  for  native  species,
           and also as a public space badly needed




           56     Issue 281 • dw
   51   52   53   54   55   56   57   58   59   60   61