Page 65 - Designing Ways 273
P. 65
efficient, therefore requiring only four
anchor points.
Construction
Construction of the Ring will begin this
fall and is expected to be completed in fall
2024. The elevation of the construction site
presents a challenge, with unpredictable
weather conditions and steep road passes.
Therefore, every detail of the construction
process has been planned in advance.
Ring of Bjólfur was the winning
proposal in a prequalified competition
issued by the municipality in 2021. The
project is being carried out as a cross-
disciplinary collaboration between
architects, landscape architects, and
structural engineers, from concept
through to construction.
• Official Project Name: Ring of Bjólfur
• Location: Seydisfjordur, Iceland
• Client: Múlaþing Municipality
• Construction: 2023-2024
• Budget: ISK 190 million
Design team
• Architects: Esja Architecture &
Arkibygg Arkitektar
• Landscape Architects: ANNA Land-
slagsarkitekt & Kjartan Mogensen
• Engineers: AXA Nordic dw
www.esjaarchitecture.com
www.arkibygg.is
dw • Issue 273 65